Air Traffic Control Camera Tower’s Irish Aviation Authority/DAA

Construction of base for proposed Camera Tower to include piling, reinforced concrete plinth for camera tower and pad foundations bases for specialist operational container, hard standing/tarmacadam access roads, perimeter security fencing to radar compounds and all associated site clearance, grading to embankments and underground ducting services.
  • Foundation to support 30 metre structure with tower base of 6.5mte x 6.5mte x 1.2mte
  • Trenches & Duct Work for telecoms and power supply to powerbase
  • Formation of compound fencing and gates
  • Installation of ESB mini pillar
  • Installation of Earthing and Lightning Protection
  • Handover of full site including RLD’s and Safety File

Company Role:

Main Contractors/PSCS

Key Packages:

  • Precast concrete piling
  • Bulk excavation
  • In-situ concrete plinth bases
  • Ducting incl. connection to live services
  • Tarmacadam access roads
  • Kilmainham 358 Mesh Security fencing
  • Lighting protection
  • Mast tower off loading & erecting
  • 20Kva Diesel Generator & container off loading & placing into position

Key Deliverables:

  • Archaeologically sensitive area
  • Works within live airport environment
  • Dust control measures
  • Delivery both project within a short time frame 5 weeks
  • Control of high water table
  • Work near high voltage power line fibre optic cable, runway lighting, etc.
  • Integrated traffic management plan for live airport traffic maintaining access for duration of the project